Tampilkan postingan dengan label Jasa. Tampilkan semua postingan
Tampilkan postingan dengan label Jasa. Tampilkan semua postingan
CO2 Repair & Maintenance - Batam
ECP - CO2 Repair & Maintenance
When a system requires service, we realize that quick response is critical.
Our team of engineers and technicians can equip your facility with the required alarm and detection equipment
ECP’s team of trained technicians can regularly test, inspect, service and repair your fire protection system to assure optimum system performance.
inspection and maintenance can help save lives and property.
Inspections services offered:

FIRE DETECTION SYSTEM
The National Fire Protection Association (NFPA) mandates that all fire alarm systems in protected premises be tested regularly.
ECP’s team of trained technicians can regularly test, inspect, service and repair your fire alarm system to assure optimum system performance.
Inspection Procedures:
Check the fire alarm panel to ensure alarm initiating devices are functioning properly at the time of inspection
Verify alarm indicating devise is functioning properly at the time of inspection
Verify supervisory signal initiating devices is functioning properly at the time of inspection
Verify system power supplies, including battery backups, are sufficient at the time of inspection
Load testing of batteries
Clean detectors with compressed air
Testing, Inspection and Monitoring Devices
Test functionality of detectors with test smoke
Check every known pull station for accessibility
Verify points being monitored are correct at the time of inspection (if the facility has a remote annunciator)
Verify signal reached the monitoring company’s office (if the system is monitored)
Sensitivity Testing
every other year your smoke detection device must have a sensitivity test in addition to the functional test. ECP can perform this test
Marine & Industrial - Batam
ECP - Marine & Industrial
Thank you for visiting our new site. We value your business, and we are committed to meeting the needs of your products and services.
ECP Marine and Industrial is a company in creating value through the provision of design, installation, maintenance and repair services engineered and electronic for services operating in Indonesia and Asia seas, together with the design, installation, maintenance and repair of electrical and mechanical. services for industrial clients in Asia.
ECP Marine & Industrial has provided our clients the best customer service and product availability from the most trusted brands in the industry. Our organizational structure is rooted in my family’s value, and we value the relationship we’ve built with our vendors and vendor customers. As we expand our client base, we remain committed to the values of our company, while always maintaining health, safety and the environment at the forefront of our organizational principles.
As an innovative supply leader, Marine & Industrial has developed a reputation for our trained employees, efficient safety standards and seamless operations that supply our offshore clients with the best service in the industry.
CO2 SYSTEM - BATAM
ECP - CO2 Fire Suppresion System

Concentration Test > Functional Tests > operation of the discharge valve or pneumatic/ electrical discharge devices should be verified.
Annually. a functional test of the control/protection circuits should be performed.Electrical discharge devices should be verified. > Alarms and Beacons function test > Signage. To advise personnel of the risk of CD2 systems in the vicinity. appropriate warning signs must be affixed in conspicuous locations > Changing and Filling. Cylinder outlets should be fitted with safety covers or antirecoil devices. whenever the cylinderis not connected to the system piping.
(or spares) without discharging may be permitted to be retained in service for a maximum of 12 years from the date of the last hydrostatic test. At the end of 12 years. they must be discharged and retested befare being returned to service
The vapor phase shall not be less than 88.5 percent carbon dioxide > Weighing. High-pressure CD2 cylindersmust be weighed
semiannually to verify that the proper volume of gas is available. Containers showing a loss in net content of more than ID percent must be refilled or replaced > Testing. High-pressure CD2 cylinders must not be recharged without a hydrostatic test (and remarking) if more than 5 years have elapsed from the date of the last test. Cylinders continuously in service.

Visit Us

Concentration Test > Functional Tests > operation of the discharge valve or pneumatic/ electrical discharge devices should be verified.
Annually. a functional test of the control/protection circuits should be performed.Electrical discharge devices should be verified. > Alarms and Beacons function test > Signage. To advise personnel of the risk of CD2 systems in the vicinity. appropriate warning signs must be affixed in conspicuous locations > Changing and Filling. Cylinder outlets should be fitted with safety covers or antirecoil devices. whenever the cylinderis not connected to the system piping.
(or spares) without discharging may be permitted to be retained in service for a maximum of 12 years from the date of the last hydrostatic test. At the end of 12 years. they must be discharged and retested befare being returned to service
The vapor phase shall not be less than 88.5 percent carbon dioxide > Weighing. High-pressure CD2 cylindersmust be weighed
semiannually to verify that the proper volume of gas is available. Containers showing a loss in net content of more than ID percent must be refilled or replaced > Testing. High-pressure CD2 cylinders must not be recharged without a hydrostatic test (and remarking) if more than 5 years have elapsed from the date of the last test. Cylinders continuously in service.

Visit Us
Langganan:
Postingan (Atom)